- Industrial Design[10]
- Electronic Products & Components Processing[1]
- Research & Development Services[1]
- Remote Control[4]
- Joysticks & Game Controllers[1]
- Electronic & Instrument Enclosures[1]
- Other Electrical Equipment[3]
- Other Power Supplies[1]
- Switching Power Supply[5]
- Sensors[1]
- Other Electronic Accessories[1]
- Electronic Data Systems[3]
- LED Displays[5]
- Other Electronic Components[1]
- Double-Sided PCB[5]
- Multilayer PCB[10]
- Other PCB & PCBA[10]
- Rigid PCB[7]
- Solar Controllers[1]
- Aquariums & Accessories[1]
- Vacuum Cleaner Parts[1]
- Dimmers[10]
- Other Lighting Accessories[2]
- LED Backlights[1]
- Other Lights & Lighting Products[1]
- Motor Controller[1]
- Motor Driver[1]
- Other Motor Accessories[1]
- Instrument Parts & Accessories[1]
- Spectrometers[1]
- Temperature Instruments[9]
- Testing Equipment[2]
Electric PCBA for energy meter
1)PCB assembly SMT processing(OEM&ODM)
2)Supplying single-sided,double-sided,multilayer PCB
3)PCBA,layout designed
PCBA pcb assembly OEM and ODM
1.We do R&D and contract manufacturing for the medical,instrument, environmental, industrial, networking,automotive, aeronautics, security and other industries.
2.Our services sell well in China, the European Union, North America, the Middle East, South Korea and other countries and regions. Our company has a fast and efficient "communication - Confirmation - R&D - test - a kind - mass production - technical service" mode of operation for OEM/ODM customers.
Item
Descriptions
pcba service
PCBA OEM&ODM
kinds of pcba manufactured
PCBA service: medical, instrument, environmental, industrial, networking, automotive, aeronautics, security and other industries equipment products
Certification
ISO9001-2000,UL,RoHS
R&D
engaged in PCB assembly, LCD driver, ODM and OEM ect products
any other controller products design and development
Quality Standard
Honor
IPC-610
obtained the "best supplier" from ALPHA company in 2006.
obtained the "best improved "supplier from partner company in 2008.
Products Market
delivery time
obtained the "best supplier" from partner company in 2009
all over the world
within 10-20days